Asphalting

AsphaltSpreading aspalth concrete at the top of stabilised base pavement layer (soil cement)

Hotmix Crew (1)road

Hot-Mix Asphalt (HMA) is a combination of approximately 95% stone, sand, or gravel bound together by 5% bitumen, therefore selection of both bitumen and aggregates is important (not one of them).  Production HMA conducted at asphalt mixing plant facility where bitumen is heated and mixed with the heated aggregate in temperature within 150 to 170 Celsius degree. To produce good quality HMA, proper plant management is important, particularly, mixing and producing temperature of asphalt mixtures.  After completion of the production process, the asphalt mixture is then placed and compacted at proper temperature within 120 to 160 Celsius degree using a series compaction roller, so quality control should be conducted to achieve the required field density, particularly, rolling pattern at placing and compacting temperatureTo serve our customers in the provinces of Riau and Riau Islands, PT. Harap Panjang has several units of asphalt mixing plant located on Tanjung Pinang, Pekanbaru, Batam, Dabo Singkep and Duri. Please contact to our local office to cooperation with.